Department of Water Supply and Sanitary Engineering, Addis Ababa Science and Technology, University, Addis Ababa, Ethiopia
 Research Article   
								
																Performance Evaluation of Water Supply Distribution System the Case of Gudo Bahir, Bahir Dar, Ethiopia 
																Author(s): Yordanos Getnet* and Sisay Demeku             
								
																
						 This thesis focused on performance evaluation of water supply distribution system: case study Gudo Bahir, Bahir Dar, Ethiopia. The main objective 
  of this study is to check the hydraulic performance of Gudo Bahir water distribution system by assessing losses of water, hydraulic performance of 
  water distribution modeling and water supply and demand gap. Hydraulic network of the study area is simulated using Bentley Water GEMS V8i 
  by using the data on the water distribution network of the area and master plan map of the town. The hydraulic simulation in the existing network 
  system to satisfy the reliability of hydraulic parameters such as the pressure at a junction, head loss at each pipe material and flow of water were 
  modeled. The water demand and supply of Gudo Bahir were not balanced. The daily water consumption of the area was 41 l/c/day used daily 
  for differ.. Read More»
						  
																DOI:
								10.37421/2165-784X.2021.11.413															  
Journal of Civil and Environmental Engineering received 1798 citations as per Google Scholar report